Chamber for Bulk Oil Distributors (CBOD), Ghana

Tullow extends FPSO shutdown by another two weeks

The date for resumption of gas supply from the FPSO Kwame Nkrumah has been postponed due to damage of the turret bearing on the floating production storage and offloading vessel. Tullow estimates that production from the FPSO will re-start in two weeks. Gas production was expected to begin this weekend after a two-week shutdown for […]